SOC 2 Type I vs Type II
Type I reports on the design of controls at a point in time. Type II reports on the operating effectiveness of those controls over a defined period (commonly 3–12 months).
Type I reports on the design of controls at a point in time. Type II reports on the operating effectiveness of those controls over a defined period (commonly 3–12 months).